Consultant: Hirgan Energy Engineering Co.
Main EPC Contractor: OIEC
Client: National Iranian South Oil Co. (NISOC)
Mansouri oilfield is a part of the southern oilfields of Iran, located 40 km south of Ahwaz city. National Iranian South Oil Company (NISOC) -with the aim of increasing production of oil from aforementioned oilfield- has decided to define an EPC/EPD project and awarded to Oil Industries & Engineering Company (OIEC). OIEC Company has awarded Engineering works to Hirgan Energy Eng. Co. too.
Some of the Project Scope of Work
- EPC of New Gas Compressor Station (w/ Capacity of 60 MMSCFD)
- EPC of a New Turbo Pump in Mansouri Old PU (w/All of Required Facilities)
- Flowlines Separation and Build a New Crude Oil Manifold in Mansouri PU/DU
- EPC of New 14 Well Pads, Access Roads, Flowlines and Wellhead Facilities
Hirgan Energy Eng. Company’s Scope of Work
All the necessary Conceptual Study/Basic Eng., Detail Design & Procurement Eng. Services, through the different engineering disciplines has been taken into account and considered by Hirgan Energy Eng. Company.
It is notable; to accomplish this project, field studies (supplementary topography & geotechnical studies), HAZOP/HAZID/SIL studies and Passive Defense Study has been followed and implemented.