Iranian Gas Engineering & Development Company has intended to construct Norabad gas compressor station on tenth Iranian Gas Trunk line (IGAT X) which is located at Norabad (Station No.101) in order to boost the pressure of the Natural gas.The compressor station comprises of four parallel trains (three in service and one stand-by) which are capable of processing 90 MMSCMD.
General Scope of Work
- Basic Design Endorsement
- Detail Design Engineering
- Procurement Engineering Service
- Pre-commissioning, Commissioning
Client: Iranian Gas Engineering & Development Company (IGEDC)
Management Consultant: Farayand Sazan Energy Consultant Company (FSEC)
EPC Contractor: Design & Inspection Company/ Hirgan Energy Engineering Company (J.V.)