Project Goals:
Troubleshooting and revamp control system of Aboozar offshore complex (three platforms), containing Conventional Control Panel, Water in Oil Analyzers, Vibration Monitoring System, Weather Monitoring Station, etc.
Scope of work:
- - Technical Survey
- - Maintenance, Revamp and start up of control system, analyzers and weather monitoring systems, etc.
- - Commissioning and start up of control system and hand over to Client.
Contractor: Hirgan Energy Engineering Co.
Client: IOEC