Project Goals:
Troubleshooting, de-bottlenecking, repair, piping modification and other related works for 30 no. different types of pumps on Aboozar Offshore Complex (three platforms), containing oil transfer pumps, test pumps, diesel firewater pumps, etc.
Scope of works:
- Technical survey
- Design and fabricate suitable steel structure for moving the pumps
- Pump troubleshooting and repair
- Pump startup and hand over to the client
Consultant: Hirgan Energy Engineering Co.
Client: IOEC