The purpose of this project is to design, supply, construct & install, commissioning a fast-installing facility to collect and increase the pressure of Asmari's associated manifold gases at Mansouri oilfield with a total capacity of 60 MMSCFD.

 

Consultant: Hirgan Energy Engineering Co.

Main EPC Contractor: OIEC

Client: National Iranian South Oil Co. (NISOC)

 

The purpose of this project is to design, supply, construct & install, commissioning a fast-installing facility to collect and increase the pressure of Asmari's associated manifold gases at Mansouri oilfield with a total capacity of 60 MMSCFD.

This aim will be achieved by turbo-compressors (w/ 3+1 arrangement) and required utilities.

Also a Turbo-pump shall be added to existing Mansouri Production unit.

 

Hirgan Energy Eng. Company’s Scope of Work

All the necessary detail design & procurement engineering through the different engineering disciplines has been taken into account and considered by Hirgan Energy Eng. Company.

It is notable; to accomplish this project, field studies (supplementary topography & geotechnical studies), HAZOP/HAZID/SIL studies and Passive Defense Study will be followed and implemented