Ramshir new oil & gas processing complex is located on the 15 kilometer down the Omidieh - Mahshahr road consists of production unit, desalting unit, gas compressor station, utilities and relevant oil & gas pipelines.t

 

Consultant: Hirgan Energy Engineering Co.

Main EPC Contractor: OIEC

Client: National Iranian South Oil Co. (NISOC)

 

Ramshir new oil & gas processing complex is located on the 15 kilometer down the Omidieh - Mahshahr road consists of production unit, desalting unit, gas compressor station, utilities and relevant oil & gas pipelines.

The capacity of production & desalting units is adopted as 55000 barrel per day and the capacity of gas compression station is derived around 120 million cubic feet per day (MMSCFD) which has the potential of  gas pressurizing up to the 1330 psig.

The desalted oil will be transferred by separate pipelines to two destinations; Omidieh Booster unit and existing Abadan oil pipeline.

Accordingly, the pressurized gas will be transferred by separate pipelines to two destinations; the NGL-300 unit and the Ramshir gas injection unit.

The required water of the complex with the capacity of 7000 barrel per day is supplied from the north-east water pipeline (@Omidieh connection) and transferred to the complex by the non-metal buried pipes.

Complex required Sweet gas with the capacity of 5 Million cubic feet per day (MMSCFD) is supplied with the excess gas of the same complex.

 

Hirgan Energy Eng. Company’s Scope of Work

All the necessary detail design & procurement engineering through the different engineering disciplines has been taken into account and considered by Hirgan Energy Eng. Company.

It is notable; to accomplish this project, field studies (supplementary topography & geotechnical studies), HAZOP/HAZID/SIL/QRA studies and Passive Defense Study (Detail Design) will be followed and implemented.